What is the starter duty cycle for CRJ 550/700/900?

Study for the Skywest CRJ Cockpit Qualification. Prepare with flashcards and multiple choice questions, each with hints and explanations. Get ready for your exam!

The starter duty cycle for the CRJ 550/700/900 is crucial for ensuring the proper operation of the aircraft's engines during the start-up process. The correct answer indicates that the starter can be engaged for a maximum of 90 seconds. This time frame is important because it helps prevent overheating and damage to the starter motor, ensuring reliable engine start performance.

Following a 90-second engagement, there should be a cool-down period to allow the starter to recover before it can be used again. This cycle helps maintain the integrity of the starter system and ensures safety and reliability during operations. Understanding the full starter duty cycle protocol is essential for pilots to manage engine starting procedures effectively and adhere to operational limitations.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy